pool.resilver.update ==================== Configure Pool Resilver Priority. If `begin` time is greater than `end` time it means it will rollover the day, e.g. begin = "19:00", end = "05:00" will increase pool resilver priority from 19:00 of one day until 05:00 of the next day. `weekday` follows crontab(5) values 0-7 (0 or 7 is Sun). .. examples(websocket):: Enable pool resilver priority all business days from 7PM to 5AM. :::javascript { "id": "6841f242-840a-11e6-a437-00e04d680384", "msg": "method", "method": "pool.resilver.update", "params": [{ "enabled": true, "begin": "19:00", "end": "05:00", "weekday": [1, 2, 3, 4, 5] }] } .. raw:: html
The resilver schedule configuration to update.
No Additional PropertiesTime when the resilver operations window begins (24-hour format).
"00:00"
    "06:30"
    "18:00"
    "23:00"
    Time when the resilver operations window ends (24-hour format).
"00:00"
    "06:30"
    "18:00"
    "23:00"
    Whether the resilver schedule is enabled.
Array of weekdays when resilver operations are allowed (1=Monday through 7=Sunday).
No Additional ItemsValue must be greater or equal to 1 and lesser or equal to 7
The updated resilver schedule configuration.
No Additional PropertiesUnique identifier for the resilver schedule entry.
Time when the resilver operations window begins (24-hour format).
"00:00"
    "06:30"
    "18:00"
    "23:00"
    Time when the resilver operations window ends (24-hour format).
"00:00"
    "06:30"
    "18:00"
    "23:00"
    Whether the resilver schedule is enabled.
Array of weekdays when resilver operations are allowed (1=Monday through 7=Sunday).
No Additional ItemsValue must be greater or equal to 1 and lesser or equal to 7